CompositesWorld

OCT 2015

CompositesWorld

Issue link: https://cw.epubxp.com/i/576646

Contents of this Issue

Navigation

Page 43 of 115

TRENDS INCREASE VERSATILITY. REDUCE WASTE. +1-716-856-2200 www.eastmancuts.com CAMX DEMOS BOOTH K100 For R&D; or production cutting of nested pattern pieces from dry and pre-preg composite materials in sheet or rolled form CUT, MARK & PUNCH AT SPEEDS UP TO 60 IPS S125 TM European Space Agency authorizes new Ariane 6, Vega C launch vehicles development The European Space Agency (ESA) has signed contracts for the development of the Ariane 6 new‑generation launcher, its launch base, and the Vega C evolution of the agency's current small launcher. The contracts were signed at ESA's Paris head ofce with, respectively, Airbus Safran Launchers (ASL, Issy‑Les‑ Moulineaux, France), France's CNES space agency (Centre National d'Etudes Spatiales, Paris) and the Vega C's prime contractor, ELV SpA (European Launch Vehicle, Colleferro, Italy), a 70/30 joint venture of Colleferro‑based Avio and the Italian Space Agency (ASI ‑ Agenzia Spaziale Italiana, Rome) that is Vega's current prime contractor. Those agreements cover all development work on the Ariane 6 and its launch base for a maiden fight in 2020, and the same on the Vega C for its 2018 debut. "These contracts will allow the development of a family of European launchers, highly competitive in the world market and ensuring autonomous access to space at fully competitive prices for ESA's Member States," says Jan Woerner, director general of ESA. "They are an important change of governance in the European launcher sector, with industry being the design authority and taking full responsibility in the development and exploitation of the launchers, and committing to deliver them to ESA and the European institutional actors at specifed competitive prices." ESA is overseeing procurement and the architecture of the overall launch systems, while industry is developing the rockets, with ASL as prime contractor and design authority for Ariane 6, and ELV serving in those capacities for Vega C. ASL and ELV are working closely together on the P120C solid‑propellant motor that will form Vega C's frst stage and Ariane's strap‑on boosters. Ariane's modular approach will ofer either two boosters (Ariane 62) or four boosters (Ariane 64), depending on the required performance. The boosters feature the largest flament wound composite motor cases ever produced in Europe. Additionally, RUAG (Zurich/Emmen, Switzerland) will fabricate the Ariane 6 fairings from aluminum honeycomb‑cored sandwich panels with carbon fber‑reinforced facesheets. The site of the launch base for Ariane 6 at Europe's Spaceport in Kourou, French Guiana, has been chosen, and prime contractor CNES is already excavating the site. The three contracts follow the decision taken at the ESA Council meeting at Ministerial level held in Luxemburg in December 2014 to maintain Europe's leadership in the fast‑changing commercial launch service market. "With the signing of these contracts we are on track on building a new family of launchers featuring common building blocks, in line with the decisions and schedule set at the Ministerial Meeting in 2014," says Gaele Winters, ESA's director of launchers. The contracts were signed by Gaele Winters, ESA's director of Launchers; Jean‑Yves Le Gall, president of CNES; Alain Charmeau, CEO/president of ASL; and Pierluigi Pirrelli, CEO of ELV. The contract amounts are €2.4 billion (US$2.77 billion) for Ariane 6 (ASL), €600 million (US$691.7 million) for the launch base (CNES) and €395 million US$455.4 million) for Vega C (ELV). AEROSPACE Source | ESA OCTOBER 2015 42 CompositesWorld

Articles in this issue

Links on this page

Archives of this issue

view archives of CompositesWorld - OCT 2015