CompositesWorld

NOV 2016

CompositesWorld

Issue link: https://cw.epubxp.com/i/742140

Contents of this Issue

Navigation

Page 35 of 51

NOVEMBER 2016 34 CompositesWorld INSIDE MANUFACTURING 4 Facings are bonded to foam core — with electrical conduit pre-installed — using polyurethane adhesive in a vacuum press (at right of image). 5 Panels are machined to create openings for windows and doors and receive bonded edge profiles. They are then labeled and readied for shipment to building sites. Source | MVC Plasticos 6 At the building site, base fixation profiles are adhesively bonded to the foundation with epoxy and fastened with screws in preparation for wall erection. Source | MVC Plasticos 3 Wall and ceiling panels begin with composite faceskins made via continuous lamination. Source | MVC Plasticos 2 Structural columns, beams and connecting profiles are pultruded at the MVC factory. Source | MVC Plasticos 1 Each model of house, school or special project is computer-designed in-house by MVC to meet standard building regulations and specific customer requirements. Source | MVC Plasticos Source | MVC Plasticos and Gazeto do Povo

Articles in this issue

Archives of this issue

view archives of CompositesWorld - NOV 2016